Plan the line around the finished product.

A useful solution connects material flow, machine sequence, operators, output checks and factory conditions. It is not a list of machines placed next to each other.

  • By material and application
  • Single process or complete line
  • Layout and training support
Process-led equipment planningYongtao equipment in a processing workshop
6Material routes
5Planning steps
1Accountable team
Start from the output

What are you actually selling after processing?

The finished product determines tolerances, visible edges, process sequence and the level of automation worth paying for.

01

Kitchen countertops

Slab sizing, sink cut-outs, mitres, front-edge profiling and polishing.

02

Tile skirting

Strip cutting, bullnose, chamfering and optional anti-slip groove processing.

03

Vanity tops

Accurate openings, polished edges, splashback pieces and repeat dimensions.

04

Stair treads

Consistent widths, safe edge profiles, grooves and durable finished surfaces.

05

Mosaic components

Small-format sizing, calibration and clean edges for repeat pattern assembly.

06

Wall & furniture panels

Large slab sizing, mitre preparation and visible-edge quality for installation.

07

Floor medallions

CAD-based waterjet contours, nesting, kerf control and dry-fit verification.

08

Profiled stone strips

Repeat moulding geometry followed by continuous surface polishing.

Line planning method

Five decisions before equipment layout.

This sequence exposes bottlenecks before the factory spends money on a machine that cannot match the upstream or downstream process.

Define incoming material

Slab or tile size, thickness, surface condition and handling constraints.

Map every operation

Cut, hole, mitre, profile, polish, dry fit, inspect, pack and rework route.

Balance the output

Match cycle time between machines instead of optimizing one station alone.

Plan people and utilities

Operators, power, water, air, waste handling, maintenance access and safe movement.

Yongtao engineering and manufacturing team
Solution deliverables

A proposal your team can evaluate.

Before ordering, the customer should be able to see what each machine does, where it sits in the process and how the expected result will be checked.

  • 01Recommended machine sequence and the role of each station
  • 02Working-size, function and destination-voltage configuration
  • 03Indicative layout, operator points and material movement
  • 04Sample test or acceptance criteria for important processes
  • 05Installation, training, spare-parts and after-sales scope
Send your production plan →